top of page

Jansen VISS Linea

building

Steel facade profile

Jansen VISS Linea

Summary

The Jansen VISS facade system, based on intermediaries and interlock connection, allows different subsystems to be assembled and disassembled independently by locking one element to two connecting parts.

Details

An intermediary connects the steel profiles to the load-bearing system, based on interlocking. Facade elements such as glazing are clamped to the mullion/transom structure using pins and clamping profiles. An aluminium cover profile is clicked on from the outside for finishing.

Owner

Architect

Industry consortium

Jansen AG

Location

Industriestrasse 34, Oberriet, Zwitserland

Construction year

2019

Gross floor area

0,0096 m2

Gross building volume

0.03 m3

Hazardous materials

None

Circularity data

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.
RP Building legend.png

Embodied mass:

Embodied carbon:

10,8 kg

16,7 kg CO2

Circularity Profile:

direct reuse/reuse by repair:

recycling:

waste:

Reused mass:

Reused carbon:

9,7 kg

15,1 kg CO2

No. of elements:

No. of disassembly steps:

4

Circularity profile

Ratio of Reuse Potential after processing.

Tonnage

gtb lab phase 1 - circularity profile tonnage.jpg

Carbon

gtb lab phase 1 - circularity profile tonnage.jpg

Material per recovery option

Ratio of Reuse Potential.

Tonnage

gtb lab phase 1 - tonnage recovery option.jpg

Carbon

gtb lab phase 1 - carbon recovery option.jpg

Reused materials per function, and per recovery option

Tonnage

gtb lab phase 1 - tonnage avoided waste.jpg

Carbon

gtb lab phase 1 - carbon avoided waste.jpg

Breakdown of materials

Tonnage

gtb lab phase 1 - tonnage material distr.jpg

Carbon

gtb lab phase 1 - carbon material distr.jpg

Overview of materials per recovery option

Tonnage

gtb lab phase 1 - tonnage overview materials.jpg

Carbon

gtb lab phase 1 - carbon overview materials.jpg

Share this page

Jansen VISS Linea

chart.png
bottom of page