GTB Lab - Phase 2

component/systeem

Laboratory for Green Transformable Building

GTB Lab - Phase 2
0.7

Samenvatting

The GTB Lab building is being built as a circular building laboratory to test and demonstrate circular building methods. It is an innovation platform for zero-waste construction, where the credo is: Demolition waste is a design flaw,” says Elma Durmisevic, founder and creator of GTB Lab©.

Details

Buildings that are dynamically and flexibly constructed from reusable materials have an essential driving function in the transition to a circular (building) economy. They serve as temporary storage for valuable building materials. In circular construction not a brick or a screw is thrown away. This is the idea behind the Green Transformable Building Lab (GTB Lab©) in Heerlen.

Ontwerp

Producent

Productielocatie

In de Cramer 173, Heerlen, Netherlands

Industrieconsortium

Habenu-Van den Kreeke, Warsco, Jansen AG, Isofolie, De Grave, Bluedec, Moooz, Soltech, Marmony, Nordish Infrared, Tarkett

Afmetingen

Lengte:

Breedte:

Hoogte (diepte):

Dikte:

Oppervlak:

Volume:

148 m2

516 m3

Schadelijke stoffen

Geen

Geschiedenis

Circulariteitsgegevens

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.
RP Product legend.png

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.

Gewicht:

Opgenomen CO2:

229,1 ton

250,0 ton CO2

Hergebruikpotentieel:

Terugwinningsopties:

0.7

Reuse by minor repair

Hergebruikt gewicht:

Hergebruikte CO2:

174,4 ton

177,1 ton CO2

Aantal elementen:

Aantal demontagestappen:

2857

27

Resterende Technische Levenscyclus:

NaN jaar

Circulariteitsprofiel

Verhouding van Hergebruikpotentieel na bewerking.

Tonnage

gtb lab phase 1 - circularity profile tonnage.jpg

99% material reuse

CO2

gtb lab phase 1 - circularity profile tonnage.jpg

99% carbon reuse

Materiaal per terugwinningsoptie

Verhouding van Hergebruikpotentieel.

Tonnage

gtb lab phase 1 - tonnage recovery option.jpg

CO2

gtb lab phase 1 - carbon recovery option.jpg

Hergebruikte materiale per functie en per terugwinningsoptie

Tonnage

gtb lab phase 1 - tonnage avoided waste.jpg

CO2

gtb lab phase 1 - carbon avoided waste.jpg

Verdeling van materialen

Tonnage

gtb lab phase 1 - tonnage material distr.jpg

CO2

gtb lab phase 1 - carbon material distr.jpg

Overzicht van materialen per terugwinningsoptie

Tonnage

gtb lab phase 1 - tonnage overview materials.jpg

CO2

gtb lab phase 1 - carbon overview materials.jpg

Deel deze pagina

GTB Lab - Phase 2

chart.png
bottom of page