Steel Core
element
Reversible steel frame
November 2021, finished.
Samenvatting
The steel structure acts as the main vertical load-bearing part of the GTB Lab. The over-dimensioning means that future transformations will not be a problem.
Details
The design of the load-bearing part of the GTB Lab 'core' is oversized to allow future adaptations to be connected to the steel frame. It is built entirely with nuts and bolts to be reversible.
The steel structure is strategically located in the centre of the building. This allows changes to be made to the sides and supports the ability to bring daylight and fresh air into the centre of the building.
Ontwerp
4D Architects
Producent
Andy Tullemans Constructiebedrijf B.V.
Productielocatie
Franklinstraat 8, Weert, The Netherlands
Materialen
Afmetingen
Length:
Width:
Height (or depth):
Thickness:
12 200 mm
4 700 mm
2 500 mm
Vorm
Oppervlakteschade
Schadelijke stoffen
Geen
Materiaalgeschiedenis
2021 - produced and assembled by Tullemans
Circulariteitsgegevens
Gewicht:
Opgenomen CO2:
13,35 ton
20,69 ton CO2
Hergebruikpotentieel:
Terugwinningsopties:
0.6
Reuse by major repair
Hergebruikt gewicht:
Hergebruikt CO2:
Aantal elementen:
Aantal demontagestappen:
84
Resterende technische levenscyclus:
97 jaar
Deel deze pagina
Steel Core